When it comes to Concrete work you have to keep the time of the year in mind. Concrete has to strengthen itself in a specific environment. Once it’s fixed and solid the shape remains till long.

Temperature affects concrete a lot. So, you should look out for the best time.

If you are looking for Concrete near me, Colin can help you in the best possible way.

What Is the Best Time to Get Concrete Services?

Let’s have a look at this in detail.

Required Temperature Will Matter:

Temperature is the biggest requirement. Temperature above 40°F and below 70°F is very favorable for concrete strengthening. For concrete to set itself, the temperature must be favorable. Rigidity and strength are one of the main characteristics of concrete. To set itself accurately it needs a specific temperature. 

Summer Is the Best Time

Summer is the best time to get your work done. Temperature such as 40 degrees is very accurate for concrete to get solid.

Concrete near me in Des Moines Iowa

The time of June, July, and August are considered best for work. Wait till these months to get your work done. Visit our site for more.

Winter Is the Enemy

The winter season and cold temperatures do not get along with the concrete work. Sometimes too much cold does not let the concrete settle itself properly, which results in numerous patterns of cracks. When the final result has cracks, it pretty much has no use. Better wait till this summer for the best results.

If you still need services in this cold weather, you can search for Concrete near me and hire Colin.

It Works Like a Cake in an Oven

It’s the same as that tray you put in your ovens. a certain amount of heat solidifies the batter of a cake. Favorable conditions and heat result in the form of the best cake. The same is with the concrete it’s like the batter that is put outside for nature to solidify it. The warmer the sun is, the better result you will get.

Beware of the High Wind

If the wind is too high on the exact day you are pouring, The chances are that the Water present in it will start evaporating too quickly. As a result, cracks will start appearing. Concrete work should be done on the day on which the wind is slower so that the final product works out perfect.

The Repair Work Time

If your concrete work is damaged and you want to repair it make sure you do it in the months between April till November. Do not take the risk of doing it in other months of extreme cold as the repair will not benefit you. 

Rainfall and Snow Should Not Be Ignored

After pouring the concrete. It requires 3 to 4 days of dry weather to set itself properly. Even one day of Snow or slight rainfall can have a huge impact on it. Making it lose its strength and rigidity. Whenever you want your work to be done check the weather forecast for rain falls. Make sure the weather is dry for another 2-3 days. If rain is expected, start your work once the rain stops.

So, are you still looking for work done? End your search and get our services right now.

Final Thoughts

Concrete work is tricky and difficult. To keep your pouring safe and get the results you desire for temperature and weather should always be kept in mind, and wait for the warm and hot weather to get your work done. Learn more here.